Inhalte aufrufen

Walt Disney Studios - Ratatouille Ride [2014]

- - - - -

189 Antworten zu diesem Thema

#11
Chrisili

    Moderator

  • Moderator
  • 7.226 Beiträge
für den darkride wartet man immer noch auf ein ok von der bank :D

naja so profitiert die usa wenigstens an den zinsen ;)


Eingefügtes Bild

Excellence is not a skill, it's an attitude

Ride on - wherever you are!


#12
Fabi

    Moderator

  • Administrator
  • 5.912 Beiträge
Hm ja, interessant. Damit wäre genug Geld da für Ratatouile, aber wie Chrisi schon sagte, wird das nicht alleine ausreichen um den Darkride auch bauen zu können. :D

Eingefügtes Bild


#13
Chrisili

    Moderator

  • Moderator
  • 7.226 Beiträge
DL Paris braucht ja auch kohle um die Hotels auszubauen und den Service wieder zu verbessern


Eingefügtes Bild

Excellence is not a skill, it's an attitude

Ride on - wherever you are!


#14
Flexrider

    Ehrenmitglied

  • Mitglied
  • PunktPunktPunktPunktPunktPunktPunkt
  • 1.263 Beiträge

Chrisili schrieb:

Hotels auszubauen

Renovieren währ eher nötig :twisted: DLP ist in den letzten Jahren so ein Drecksloch geworden...

#15
Chrisili

    Moderator

  • Moderator
  • 7.226 Beiträge
das mein ich mit ausbauen - renovieren = auf den alten stand bringen, ausbauen = verbessern :twisted:


Eingefügtes Bild

Excellence is not a skill, it's an attitude

Ride on - wherever you are!


#16
Fabi

    Moderator

  • Administrator
  • 5.912 Beiträge
Hab hier einen sehr interessanten Artikel über das DLP bzw. Ratatouille entdeckt. Scheint so als würde ich spätestens in drei Jahren Euro Disney besuchen müssen. :shock:

Angehängte Bilder: 401994_10151146468945615_278714015614_22311110_264973567_n.jpg

Die wichtigsten Stellen:

Zitat

WDS Ratatouille Dark Ride Construction Will Begin Anytime Soon !

Okay, this time this is it, we can say that the construction of the awaited Ratatouille dark ride at DLP Walt Disney Studios will begin anytime soon! Not only as it was announced this week DLP now have an additional 150M € credit line from the WDC which is more or less the price of the ride and land - but, before they begin to build it, the french law request to display on site a construction announcement. That's what happened this week and generally when this is done construction begin anytime soon. You have a picture of it above, posted on the Disney Central Plaza forum by the always excellent Mouetto.

We also have new infos about the ride which is supposed to be called "Ratatouille Kitchen Calamity"! Note that this is the project title and that the final attraction title might change as it was the case on Toon Studio's Crush's Coaster previously called "Crush's Turtle Twister". Anyway, the project title bring some infos about the ride and it means that a big part of the ride should happen inside Gusteau's kitchen.

...

You'll note that the picture on the top provides also interesting infos about the Ratatouille land. First, we can note that it's not written explicitly "Ratatouille attraction" but "Creation of attraction Toon Studio D", which is the code name of it, simply because it is located in the Toon Studio land. Then, we can see that the buildings construction is supposed to be almost 18 meters high which is as high as a six floor building in Paris! You can see above a rendering showing the Paris themed area, and i remind you that a restaurant will also open in the land, which is more than logical considering the Ratatouille original story.

We also see on the top picture the size of the land, in square meters, and i think that the "250796 sam" is referring to the total area of Toon Studio. The others 5719 sqm might refer to the Ratatouille land area, which makes an area of 57m x 100m, more or less. Logistically speaking the area is located close to the new Toy Story Playland and behind the Costuming building and as this is a kind of cul de sac let's hope that it won't create any guest flow problem - not sure, though, specially if the attraction is as popular as expected.

The ride and Ratatouille area are supposed to need two years to be build, so don't expect an opening before fall 2013 at the earliest. But at least we know that the project is now a "go" and all we have to do is to wait, something that DLP fans are used to do (!).

...

Ganzer Artikel + Quelle

Eingefügtes Bild


#17
Fabi

    Moderator

  • Administrator
  • 5.912 Beiträge
Damit wird das hier nun der offizielle Pariser Bauthread für den Ratatouille-Darkride, denn Landclearing has already begun!

Angehängte Bilder: la-foto1.jpg
Angehängte Bilder: camino-secundario.jpg

Dazu reiche ich noch ein paar Bilder der bereits bestehenden Pariser Straßenzeile mit "hidden Rats" z. B. an den Bänken.

Angehängte Bilder: dsc02565.jpg
Angehängte Bilder: dsc02567.jpg
Angehängte Bilder: dsc02612.jpg
Angehängte Bilder: dsc02576.jpg

Quelle

Eingefügtes Bild


#18
Hiljers

    Eingeweihter

  • Mitglied
  • PunktPunktPunktPunktPunktPunkt
  • 678 Beiträge
Endlich kommt was! Schon wieder ein Zeitpunkt für den einen Smilie, der hier so überhäufig benutzt wird. xD


RATATOUILLE! :love2:

#19
Chrisili

    Moderator

  • Moderator
  • 7.226 Beiträge
bis 2014 haben wir ja lange zeit uns zu freuen

hier ein Fanvideo zum Darkride



Eingefügtes Bild

Excellence is not a skill, it's an attitude

Ride on - wherever you are!


#20
Fabi

    Moderator

  • Administrator
  • 5.912 Beiträge
Das Video ist sehr toll! :love2:

Eingefügtes Bild






1 Benutzer lesen gerade dieses Thema

0 Mitglieder, 1 Gäste, 0 anonyme Nutzer